The Challenge
A production line at a global F&B facility was designed to run 46 hours between sanitation cycles. However, operators were repeatedly failing swab tests, forcing two additional $13,000 cleanings per week. The root cause was inconsistent execution of the sanitation procedure across shifts.
The Squint Solution
Using Squint, the team standardized the sanitation workflow and created interactive training modules with guided steps and built-in knowledge checks. Every operator retrained on the correct procedure using Squint's step-by-step guidance.

The Results
After retraining, the line consistently hit the 46-hour sanitation target. Operators averaged 98% on post-training assessments, and the facility eliminated the excess cleaning cycles, saving $26,000 per week in unnecessary sanitation costs.